Eurosets oxy leak
Preprimed emergency pump (primed Friday 29th March).
Put in theatre for scheduled root and hemiarch on 1/04/2025.
Very large leak, possibly after water lines turned on but fluid in gas line and strong stream at gas escape.
Oxy change before surgery.
No impact on patient or delay.
Made easier by perfusion team numbers (three staff during changeout made it quicker)
Pre-primed pumps have a water circuit pressure check with a homemade positive pressure tester which is recorded on our checklist laminate. Incident shared with perfusion team to re-enforce checks if necessary. Awaiting assessment from supplier
Eurosets A.L one plus oxygenator: AG5204: 010669209